FAN5078MPX
- Manufacturer's Part No.:FAN5078MPX
- Manufacturer:
- Categories:
- Sub-Categories:
- Series:-
- Description:IC CONVERTER DDR1 DDR2 24MLP
- Datasheet:
- Quantity:RFQAdd to RFQ List
- Payment:
- Delivery:
- Available: 12453
Reference Price(In US Dollars)
Qty | Unit Price | Ext.Price |
---|---|---|
1+ | US $0.00000 | US $0.00 |
Do you want a lower wholesale price? Please send us an inquiry, and we will respond immediately.
- Description
- Alternatives
- Shopping Guide
The FAN5078 DDR memory regulator combines a highefficiency Pulse-Width Modulated (PWM) controller to generate the memory supply voltage, VDDQ, and a linear regulator to generate termination voltage (VTT).
Features
• PWM regulator for VDDQ (2.5V or 1.8)
• Linear LDO regulator generates VTT = VDDQ/2, 1.5A Peak sink/source capability
• AMT / M-state support
• Control to generate 5V USB
• ACPI drive and control for 5V DUAL generation
• 3.3V internal LDO for 3V-ALW generation
• 300 kHz fixed frequency switching
• RDS(ON) current sensing or optional current sense resistor for precision over-current detect
• Internal synchronous boot diode
• Common Power Good signal for all voltages
• Input under-voltage lockout (UVLO)
•
Thermal shutdown
• Latched multi-fault protection
• Precision reference output for ULDO controllers
• 24-pin 5 x 5 MLP packageApplications
• DDR VDDQ and VTT voltage generation with ACPI support
• Desktop PCs
• Servers
Functional Equivalent (FE) materials, including Fused Filament Fabrication (FFF) form, assembly, and functionally compatible substitute materials.
SHIPPING GUIDE
Shipping Methods
Rest assured that your orders will be handled by these trusted providers, such as DHL, FedEx, SF, and UPS.
Shipping Cost
Shipping starts at $40 but varies for destinations like South Africa, Brazil, India, and more. The actual shipping charges depend on time zone, country, and package weight/volume.
Delivery Time
We ship orders once daily, around 5 p.m., except on Sundays. The estimated delivery time may vary depending on the courier service you choose, but typically ranges from 5 to 7 business days.
RELEVANT BLOGS & POSTS
Professional Platform
Full-speed Delivery
Wide Variety of Products
365 Days of Quality Assurance